BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Riser Assemblies

Assembly

Two main load-bearing straps carrying suspension lines from canopy to harness, with separate brake lever inputs. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Riser Assemblies parts and their functions

4 top-level parts · 5 parts in total · full bill of materials below
Riser Assemblies parts diagram: 1 left riser, 2 right riser, 3 riser connector, 4 brake line routing. 5 parts in 4 top-level items.
Riser Assemblies parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Left Riser 1× Left-side 4-line stack with brake attachment
2 Right Riser 1× Right-side 4-line stack with brake attachment
3 Riser Connector 2× Carabiner links to harness attachment points
4 Brake Line Routing 1× Geometry and pulleys for brake mechanical advantage

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Riser Assemblies

4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Left Riser paraglider-left-riser 1× 1 · part
2 Right Riser paraglider-right-riser 1× 1 · part
3 Riser Connector paraglider-riser-connector 2× 2 · part
4 Brake Line Routing paraglider-brake-line-routing 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the riser assemblies is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks