Lateral Distribution Manifold
AssemblyPVC underbed piping array distributing backwash flow evenly across filter bottom, then collecting filtered water during normal filtration. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Lateral Distribution Manifold parts and their functions
5 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Lateral Main Riser | 1× | Central riser pipe from tank drain hub |
| 2 | Lateral Arm Assembly | 6× | Horizontal PVC arms radiating from center |
| 3 | Slotted Lateral Tubing | 1× | Slotted or perforated lateral tubing for water entry points |
| 4 | Lateral Arm End Caps | 1× | End caps sealing lateral arm tips |
| 5 | Ball Bearing | 2× | Support bushings on lateral manifold riser |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Lateral Distribution Manifold
5 top-level lines · 5 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Lateral Main Riser | pool-sand-filter-lateral-main | 1× | 1 | · | part |
| 2 | Lateral Arm Assembly | pool-sand-filter-lateral-arms | 6× | 6 | · | part |
| 3 | Slotted Lateral Tubing | pool-sand-filter-lateral-slots | 1× | 1 | · | part |
| 4 | Lateral Arm End Caps | pool-sand-filter-lateral-plugs | 1× | 1 | · | part |
| 5 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the lateral distribution manifold is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |