BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Controls

Assembly

The throttle the pilot holds and the brake toggles that steer and flare the wing. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Controls parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Controls parts diagram: 1 hand throttle, 2 brake toggle, 3 kill switch, 4 trim adjuster, 5 wire bundle. 7 parts in 5 top-level items.
Controls parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hand Throttle 1× Hand throttle
2 Brake Toggle 2× Brake handles
3 Kill Switch 1× Engine cutout
4 Trim Adjuster 2× Trim adjusters
5 Wire Bundle 1× Group of insulated conductors cut to length, terminated, and bound together to carry power and signals between the assemblies of a machine.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Controls

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hand Throttle powered-paraglider-throttle 1× 1 · part
2 Brake Toggle powered-paraglider-brake-toggle 2× 2 · part
3 Kill Switch powered-paraglider-kill-switch 1× 1 · part
4 Trim Adjuster powered-paraglider-trim 2× 2 · part
5 Wire Bundle wire-bundle 1× 1 · part

Where the controls is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks