BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control and Instrumentation

Assembly

Speed control, pressure measurement, temperature monitoring, and data reduction software for automated test operations. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control and Instrumentation parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Control and Instrumentation parts diagram: 1 speed control, 2 pressure sensor, 3 temperature sensor, 4 control software. 7 parts in 4 top-level items.
Control and Instrumentation parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Speed Control 1× Variable-frequency motor drive (VFD)
2 Pressure Sensor 3× Static, dynamic, and differential pressure transducers
3 Temperature Sensor 2× Ambient and settling-chamber temperature probes
4 Control Software 1× Data reduction and control application

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control and Instrumentation

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Speed Control wind-tunnel-speed-control 1× 1 · part
2 Pressure Sensor wind-tunnel-pressure-sensor 3× 3 · part
3 Temperature Sensor wind-tunnel-temperature-sensor 2× 2 · part
4 Control Software wind-tunnel-software 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the control and instrumentation is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks