Cable and Pulley System
AssemblyMultiple cables routed through adjustable pulleys, driven by the weight stacks via a mechanical connection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cable and Pulley System parts and their functions
4 top-level parts · 22 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Steel Braided Cable | 4× | Steel-braided cable, one per weight stack up-and-down |
| 2 | Pulley Block Assembly | 4× | Sealed-bearing pulley blocks |
| 3 | Cable End Fitting | 8× | End connections for attachments |
| 4 | Cable Routing Guide | 6× | Cable routing guides |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cable and Pulley System
4 top-level lines · 4 rows shown · 22 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Steel Braided Cable | functional-trainer-cable | 4× | 4 | · | part |
| 2 | Pulley Block Assembly | functional-trainer-pulley-block | 4× | 4 | · | part |
| 3 | Cable End Fitting | functional-trainer-cable-end-fitting | 8× | 8 | · | part |
| 4 | Cable Routing Guide | functional-trainer-cable-guide | 6× | 6 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cable and pulley system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$300. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sonacomstar.com ↗ | Gurugram, IN | EV driveline & motors | 1,000 pcs | 8–12 wks |
| shdrive.cn ↗ | Yuhuan, CN | Gears & driveline | 1,000 pcs | 8–12 wks |
| bharatgears.com ↗ | Mumbai, IN | Automotive gears | 1,000 pcs | 8–12 wks |
|
🇮🇳ZF India
zf.com ↗
|
Pune, IN | Driveline & chassis | 1,000 pcs | 8–12 wks |
| advancegroup.cn ↗ | Hangzhou, CN | Gearboxes | 1,000 pcs | 8–12 wks |