BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r123068 of this page, not the current version. Go to current · history

Cam & Cable Linkage

Assembly

The shaping link: a profiled cam at the arm pivots takes up cable at a varying rate so the stack load stays even across the arms full arc, routed over pulleys to the stack. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Cam & Cable Linkage

5 top-level lines as of r123068
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Load Cam pec-cam 1× 1 · part
2 Pulley 2 parts pec-pulley 2× 2 0 assembly
3 Steel Cable pec-cable 1× 1 · part
4 Cable Thimble pec-cable-thimble 2× 2 · part
5 Fastener Set fastener-set 1× 1 · part