BOMwiki the bill-of-materials encyclopedia
30,390,942 parts mapped · 192,471 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Rail and Skid System

Assembly

Skids, rails, and bearing surfaces that reduce friction between the sled and the floor to near-zero. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Rail and Skid System parts and their functions

4 top-level parts · 13 parts in total · full bill of materials below
Rail and Skid System parts diagram: 1 skid runner, 2 guide rail rod, 3 roller bearing, 4 sheet metal panel. 13 parts in 4 assemblies.
Rail and Skid System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Skid Runner Low-friction contact points
2 Guide Rail Rod Precision guide rods
3 Roller Bearing Glide surfaces
4 Sheet Metal Panel Plastic or UHMWPE slider plate

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Rail and Skid System

4 top-level lines · 4 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Skid Runner prowler-sled-skid-runner 2 · part
2 Guide Rail Rod prowler-sled-rail-rod 2 · part
3 Roller Bearing prowler-sled-roller-bearing 8 · part
4 Sheet Metal Panel sheet-panel 1 · part

Where the rail and skid system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks