BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Accessory & Maintenance Kit

Assembly

Guide combs, lubricants, and coolant that keep blades cutting and below skin-safe temperature. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Accessory & Maintenance Kit parts and their functions

4 top-level parts · 9 parts in total · full bill of materials below
Accessory & Maintenance Kit parts diagram: 1 guide comb, 2 clipper blade oil, 3 blade coolant spray, 4 cleaning brush. 9 parts in 4 top-level items.
Accessory & Maintenance Kit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Guide Comb 6× Snap-on lengths
2 Clipper Blade Oil 1× Clipper oil
3 Blade Coolant Spray 1× Blade coolant
4 Cleaning Brush 1× Stiff brush for clearing hair from blade teeth and vents between animals.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Accessory & Maintenance Kit

4 top-level lines · 4 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Guide Comb vet-clipper-guide-comb 6× 6 · part
2 Clipper Blade Oil vet-clipper-blade-oil 1× 1 · part
3 Blade Coolant Spray vet-clipper-coolant-spray 1× 1 · part
4 Cleaning Brush vet-clipper-cleaning-brush 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the accessory & maintenance kit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks