Pressure Vessel
AssemblyWelded aluminum-lithium conical structure holding cabin pressure and carrying all launch, abort, and landing loads. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Pressure Vessel parts and their functions
7 top-level parts · 23 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Vessel Weldment | 1× | Machined and welded primary shell |
| 2 | Side Hatch | 1× | Crew ingress/egress hatch |
| 3 | Docking Tunnel | 1× | Forward tunnel and hatch |
| 4 | Capsule Window | 4× | Multi-pane windows |
| 5 | Backshell Panel | 12× | TPS-covered backshell |
| 6 | Umbilical Port | 2× | Service module interfaces |
| 7 | O-Ring Set | 2× | Hatch and penetration seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Pressure Vessel
7 top-level lines · 7 rows shown · 23 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Vessel Weldment | crew-capsule-vessel-weldment | 1× | 1 | · | part |
| 2 | Side Hatch | crew-capsule-side-hatch | 1× | 1 | · | part |
| 3 | Docking Tunnel | crew-capsule-docking-tunnel | 1× | 1 | · | part |
| 4 | Capsule Window | crew-capsule-window | 4× | 4 | · | part |
| 5 | Backshell Panel | crew-capsule-backshell-panel | 12× | 12 | · | part |
| 6 | Umbilical Port | crew-capsule-umbilical-port | 2× | 2 | · | part |
| 7 | O-Ring Set | oring-set | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the pressure vessel is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |