Gaseous Oxygen Tank (COPV)
AssemblyA full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Gaseous Oxygen Tank (COPV) parts and their functions
4 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | COPV Titanium Liner | 1× | |
| 2 | Carbon-Fibre Overwrap | 1× | |
| 3 | Pressure Regulator | 1× | |
| 4 | Pressure Sensor | 1× | Transduces fluid or gas pressure into an electrical signal. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Gaseous Oxygen Tank (COPV)
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | COPV Titanium Liner | crewed-spacecraft-copv-liner | 1× | 1 | · | part |
| 2 | Carbon-Fibre Overwrap | crewed-spacecraft-copv-overwrap | 1× | 1 | · | part |
| 3 | Pressure Regulator | crewed-spacecraft-pressure-regulator | 1× | 1 | · | part |
| 4 | Pressure Sensor | pressure-sensor | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the gaseous oxygen tank (COPV) is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |