BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Booster Cold-Gas RCS

Assembly

Nitrogen thruster pods at the top of the booster that flip the stage end-over-end after separation to point the engines into the airstream, then hold attitude until the grid fins bite. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Booster Cold-Gas RCS parts and their functions

3 top-level parts · 355 parts in total · full bill of materials below
Booster Cold-Gas RCS parts diagram: 1 cold-gas thruster pod, 2 COPV pressure vessel, 3 RCS distribution manifold. 355 parts in 3 top-level items.
Booster Cold-Gas RCS parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cold-Gas Thruster Pod 5 parts 2× Two opposed nitrogen pods
2 COPV Pressure Vessel 4× Nitrogen storage
3 RCS Distribution Manifold 5 parts 1× Regulation and distribution

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Booster Cold-Gas RCS

3 top-level lines · 18 rows shown · 355 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cold-Gas Thruster Pod 5 parts reusable-launch-vehicle-rcs-thruster-pod 2× 2 164 assembly
1.1 Cold-Gas Thruster orbital-launch-vehicle-cold-gas-thruster 4× 8 · part
1.2 Propellant Valve orbital-launch-vehicle-propellant-valve 4× 8 · part
1.3 RCS Valve Driver Board 5 parts reusable-launch-vehicle-rcs-valve-driver 1× 2 132 assembly
1.3.1 Bare PCB pcb-bare 1× 2 · part
1.3.2 Microcontroller mcu 1× 2 · part
1.3.3 Relay relay 4× 8 · part
1.3.4 SMD Passive (R/C/L) smd-passives 120× 240 · part
1.3.5 Connector connector 6× 12 · part
1.4 O-Ring Set oring-set 8× 16 · part
1.5 Fastener Set fastener-set 16× 32 · part
2 COPV Pressure Vessel orbital-launch-vehicle-copv 4× 4 · part
3 RCS Distribution Manifold 5 parts reusable-launch-vehicle-rcs-manifold 1× 1 23 assembly
3.1 Cold-Gas Pressure Regulator reusable-launch-vehicle-rcs-regulator 1× 1 · part
3.2 Propellant Valve orbital-launch-vehicle-propellant-valve 2× 2 · part
3.3 Pressure Sensor pressure-sensor 2× 2 · part
3.4 O-Ring Set oring-set 6× 6 · part
3.5 Fastener Set fastener-set 12× 12 · part

Something wrong in this list? Report a problem with this BOM.

Where the booster cold-gas RCS is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks