Pintle Injector Assembly
Single central pintle element in place of hundreds of coaxial ones: LOX flows down the centre post and sheets radially into an annular fuel curtain, inherently stable and throttleable, which is why a landing engine wants one. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour product / assembly shared across products atomic part related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials
5 top-level lines · 5 rows shown · 31 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pintle Post | reusable-launch-vehicle-pintle-post | 1× | 1 | · | part |
| 2 | Pintle Fuel Sleeve | reusable-launch-vehicle-pintle-sleeve | 1× | 1 | · | part |
| 3 | Injector Manifold | reusable-launch-vehicle-injector-manifold | 1× | 1 | · | part |
| 4 | O-Ring Set | oring-set | 4× | 4 | · | part |
| 5 | Fastener Set | fastener-set | 24× | 24 | · | part |
Used in 2 assemblies
Sourcing: likely vendors
Companies that make this · indicative price $5–$2k · MOQ & lead are typical| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |