BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hard Upper Torso

Assembly

Fiberglass shell forming the structural hub of the suit: arms, helmet, life support backpack, and display module all mount to it. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hard Upper Torso parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Hard Upper Torso parts diagram: 1 HUT shell, 2 scye bearing ring, 3 helmet disconnect ring, 4 wire bundle, 5 fastener set. 8 parts in 5 top-level items.
Hard Upper Torso parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 HUT Shell 1× Fiberglass torso shell
2 Scye Bearing Ring 2× Shoulder mounting rings
3 Helmet Disconnect Ring 1× Helmet disconnect ring
4 Wire Bundle 2× Internal suit wiring
5 Fastener Set 2× PLSS and DCM mounting hardware

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hard Upper Torso

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 HUT Shell space-suit-hut-shell 1× 1 · part
2 Scye Bearing Ring space-suit-scye-bearing-ring 2× 2 · part
3 Helmet Disconnect Ring space-suit-helmet-ring 1× 1 · part
4 Wire Bundle wire-bundle 2× 2 · part
5 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the hard upper torso is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks