BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

First-Stage RP-1 Tank

Assembly

Lower tank carrying ~125 t of RP-1 kerosene; shorter than the LOX tank because kerosene is denser and the mixture ratio runs oxygen-rich by mass. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

First-Stage RP-1 Tank parts and their functions

5 top-level parts · 245,022 parts in total · full bill of materials below
First-Stage RP-1 Tank parts diagram: 1 tank barrel panel, 2 tank dome, 3 slosh baffle, 4 structural fastener, 5 pressure sensor. 245,022 parts in 5 top-level items.
First-Stage RP-1 Tank parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Tank Barrel Panel 6× Machined Al-Li isogrid panel, friction-stir welded to its neighbours to form a barrel section.
2 Tank Dome 2× Spun or gore-welded elliptical dome closing the tank end.
3 Slosh Baffle 10× Ring baffle that damps propellant slosh modes which would otherwise couple into the control loop.
4 Structural Fastener 245000× Internal hardware and tunnel fastening
5 Pressure Sensor 4× Transduces fluid or gas pressure into an electrical signal.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for First-Stage RP-1 Tank

5 top-level lines · 5 rows shown · 245,022 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tank Barrel Panel orbital-launch-vehicle-tank-barrel-panel 6× 6 · part
2 Tank Dome orbital-launch-vehicle-tank-dome 2× 2 · part
3 Slosh Baffle orbital-launch-vehicle-slosh-baffle 10× 10 · part
4 Structural Fastener orbital-launch-vehicle-structural-fastener 245000× 245,000 · part
5 Pressure Sensor pressure-sensor 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the first-stage RP-1 tank is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks