Structural Fastener
PartAerospace bolt, rivet or lockbolt; fastener populations in the five-to-six-figure range per major assembly dominate a launch vehicle’s parts rollup. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Where the structural fastener is used
2 products across 1 domain contain it, directly or inside a sub-assemblyUsed in 15 assemblies
First-Stage LOX Tank
First-Stage RP-1 Tank
Thrust Structure (Octaweb)
Base Heatshield
Second-Stage Tank
Interstage
Fairing Half
Booster LOX Tank (Subcooled)
Booster RP-1 Tank (Chilled)
Octaweb Thrust Structure
Landing Gear Set
Re-entry Base Heatshield
Second-Stage Tank
Interstage
Recoverable Fairing Half
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.01–$2. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sundram.com ↗ | Chennai, IN | Fasteners | 10,000 pcs | 3–5 wks |
| lpsindia.com ↗ | Rohtak, IN | Fasteners | 10,000 pcs | 3–5 wks |
| escort-fastener.com ↗ | Suzhou, CN | Fasteners | 10,000 pcs | 3–5 wks |
| tbfastener.com ↗ | Shanghai, CN | Fasteners | 10,000 pcs | 3–5 wks |
| sterlingtools.in ↗ | Faridabad, IN | Fasteners | 10,000 pcs | 3–5 wks |