Second-Stage Tank
AssemblyCommon-bulkhead tank stacking LOX above RP-1 behind a single insulated dome, saving an interstage’s worth of length and mass. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Second-Stage Tank parts and their functions
5 top-level parts · 150,019 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tank Barrel Panel | 4× | Machined Al-Li isogrid panel, friction-stir welded to its neighbours to form a barrel section. |
| 2 | Tank Dome | 3× | Two ends plus common bulkhead |
| 3 | Slosh Baffle | 8× | Ring baffle that damps propellant slosh modes which would otherwise couple into the control loop. |
| 4 | Structural Fastener | 150000× | Internal hardware fastening |
| 5 | Pressure Sensor | 4× | Transduces fluid or gas pressure into an electrical signal. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Second-Stage Tank
5 top-level lines · 5 rows shown · 150,019 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tank Barrel Panel | orbital-launch-vehicle-tank-barrel-panel | 4× | 4 | · | part |
| 2 | Tank Dome | orbital-launch-vehicle-tank-dome | 3× | 3 | · | part |
| 3 | Slosh Baffle | orbital-launch-vehicle-slosh-baffle | 8× | 8 | · | part |
| 4 | Structural Fastener | orbital-launch-vehicle-structural-fastener | 150000× | 150,000 | · | part |
| 5 | Pressure Sensor | pressure-sensor | 4× | 4 | · | part |
Where the second-stage tank is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |