Re-entry Base Heatshield
AssemblyEngine-bay closeout that takes recirculating plume heating at liftoff and then full retro-propulsive re-entry heating tail-first, built to be inspected and reflown, not replaced. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Re-entry Base Heatshield parts and their functions
3 top-level parts · 60,064 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Heatshield Panel | 24× | Metallic sandwich panels |
| 2 | Engine Bay Thermal Blanket | 40× | Flexible high-temp closeouts |
| 3 | Structural Fastener | 60000× | Panel and seal retention |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Re-entry Base Heatshield
3 top-level lines · 3 rows shown · 60,064 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Heatshield Panel | orbital-launch-vehicle-heatshield-panel | 24× | 24 | · | part |
| 2 | Engine Bay Thermal Blanket | reusable-launch-vehicle-engine-bay-blanket | 40× | 40 | · | part |
| 3 | Structural Fastener | orbital-launch-vehicle-structural-fastener | 60000× | 60,000 | · | part |
Where the re-entry base heatshield is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |