BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Grease Filter Bank

Assembly

A sloped row of UL 1046 listed baffle filters that spin grease out of the exhaust stream by forcing it through sharp directional changes. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Grease Filter Bank parts and their functions

3 top-level parts · 9 parts in total · full bill of materials below
Grease Filter Bank parts diagram: 1 baffle grease filter, 2 filter track, 3 filter drip rail. 9 parts in 3 top-level items.
Grease Filter Bank parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Baffle Grease Filter 6× 495×495 mm stainless
2 Filter Track 2× Upper and lower rails
3 Filter Drip Rail 1× Filter runoff channel

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Grease Filter Bank

3 top-level lines · 3 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Baffle Grease Filter commercial-kitchen-hood-baffle-filter 6× 6 · part
2 Filter Track commercial-kitchen-hood-filter-track 2× 2 · part
3 Filter Drip Rail commercial-kitchen-hood-drip-rail 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the grease filter bank is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks