Stacking and Bundling System
AssemblyAutomated conveyor system stacking finished duct sections and applying strapping for shipment. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Stacking and Bundling System parts and their functions
7 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Conveyor Belt | 1× | Powered conveyor receiving finished ducts from the line |
| 2 | Conveyor Motor | 1× | Motor driving the conveyor belt |
| 3 | Conveyor Bearing | 2× | Bearings supporting conveyor rollers |
| 4 | Stacking Arm | 1× | Adjustable mechanical arm stacking ducts into bundles |
| 5 | Stacking Motor | 1× | Motor operating the stacking arm |
| 6 | Strapping Dispenser | 1× | Automated plastic or steel strapping dispenser |
| 7 | Strapping Tensioner | 1× | Tensioning device securing straps tightly |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Stacking and Bundling System
7 top-level lines · 7 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Conveyor Belt | ductwork-fabrication-line-conveyor-belt | 1× | 1 | · | part |
| 2 | Conveyor Motor | ductwork-fabrication-line-conveyor-motor | 1× | 1 | · | part |
| 3 | Conveyor Bearing | ductwork-fabrication-line-conveyor-bearing | 2× | 2 | · | part |
| 4 | Stacking Arm | ductwork-fabrication-line-stacking-arm | 1× | 1 | · | part |
| 5 | Stacking Motor | ductwork-fabrication-line-arm-motor | 1× | 1 | · | part |
| 6 | Strapping Dispenser | ductwork-fabrication-line-strapping-dispenser | 1× | 1 | · | part |
| 7 | Strapping Tensioner | ductwork-fabrication-line-strapping-tensioner | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the stacking and bundling system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |