BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Safety Control Assembly

Assembly

Limit switches and safety relays that shut down burner if overheated or flame lost. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Safety Control Assembly parts and their functions

2 top-level parts · 2 parts in total · full bill of materials below
Safety Control Assembly parts diagram: 1 high-limit thermostat, 2 flame failure relay. 2 parts in 2 top-level items.
Safety Control Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 High-Limit Thermostat 1× Temp cutout
2 Flame Failure Relay 1× Deenergizes solenoid gas valve if flame signal is lost within 30 seconds.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Safety Control Assembly

2 top-level lines · 2 rows shown · 2 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 High-Limit Thermostat garage-unit-heater-high-limit-switch 1× 1 · part
2 Flame Failure Relay garage-unit-heater-flame-failure-relay 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the safety control assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks