BOMwiki the bill-of-materials encyclopedia
30,390,942 parts mapped · 192,471 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Insulated Cabinet

Assembly

Foam-lined sheet-metal box that holds the core and fans, blocks condensation, and damps fan noise. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Insulated Cabinet parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Insulated Cabinet parts diagram: 1 cabinet shell, 2 foam insulation liner, 3 access door, 4 hanging bracket, 5 fastener set. 6 parts in 5 assemblies.
Insulated Cabinet parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cabinet Shell
2 Foam Insulation Liner EPS / closed-cell foam
3 Access Door
4 Hanging Bracket
5 Fastener Set Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Insulated Cabinet

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cabinet Shell hrv-cabinet-shell 1 · part
2 Foam Insulation Liner hrv-insulation-liner 1 · part
3 Access Door hrv-access-door 1 · part
4 Hanging Bracket hrv-hanging-bracket 2 · part
5 Fastener Set fastener-set 1 · part

Where the insulated cabinet is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks