Inspection Tunnel
AssemblySteel tunnel housing with lead shielding and lead-rubber curtains sealing the X-ray beam inside. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Inspection Tunnel
5 top-level lines as of r10705| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tunnel Housing | baggage-scanner-tunnel-housing | 1× | 1 | · | part |
| 2 | Lead Shielding | baggage-scanner-lead-shield | 1× | 1 | · | part |
| 3 | Entry Lead Curtain | baggage-scanner-entry-curtain | 1× | 1 | · | part |
| 4 | Exit Lead Curtain | baggage-scanner-exit-curtain | 1× | 1 | · | part |
| 5 | Fastener Set | fastener-set | 2× | 2 | · | part |