BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Troop Compartment

Assembly

Rear compartment seating the dismount squad with firing ports, periscopes, and stowage. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Troop Compartment parts and their functions

6 top-level parts · 20 parts in total · full bill of materials below
Troop Compartment parts diagram: 1 bench seat, 2 firing port, 3 crew HVAC unit, 4 stowage bin, 5 heating element, 6 fastener set. 20 parts in 6 top-level items.
Troop Compartment parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bench Seat 6× Blast-resistant bench seats
2 Firing Port 6× Firing ports with periscopes
3 Crew HVAC Unit 1× Crew climate unit
4 Stowage Bin 4× Ammunition and kit bins
5 Heating Element 1× Resistance wire or ribbon in a metal sheath or ceramic carrier that converts electric current into heat.
6 Fastener Set 2× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Troop Compartment

6 top-level lines · 6 rows shown · 20 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bench Seat infantry-fighting-vehicle-bench-seat 6× 6 · part
2 Firing Port infantry-fighting-vehicle-firing-port 6× 6 · part
3 Crew HVAC Unit infantry-fighting-vehicle-hvac-unit 1× 1 · part
4 Stowage Bin infantry-fighting-vehicle-stowage-bin 4× 4 · part
5 Heating Element heating-element 1× 1 · part
6 Fastener Set fastener-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the troop compartment is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks