BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

ECU Interface

Assembly

Programmable controller that orchestrates expansion sequence, monitors load sensors, and ensures synchronized panel extension. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

ECU Interface parts and their functions

6 top-level parts · 32 parts in total · full bill of materials below
ECU Interface parts diagram: 1 control computer, 2 load sensor array, 3 limit switch set, 4 relay, 5 LCD panel, 6 fastener set. 32 parts in 6 assemblies.
ECU Interface parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Control Computer Rugged industrial PLC with CAN-bus interface
2 Load Sensor Array Pressure transducers on each cylinder
3 Limit Switch Set End-of-travel and safety stops
4 Relay Manifold spool actuation and alarm outputs
5 LCD Panel Status display and basic HMI
6 Fastener Set 12× PCB mounting and harness clips

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for ECU Interface

6 top-level lines · 6 rows shown · 32 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Control Computer military-shelter-system-control-computer 1 · part
2 Load Sensor Array military-shelter-system-load-sensor-array 4 · part
3 Limit Switch Set military-shelter-system-limit-switch-set 8 · part
4 Relay relay 6 · part
5 LCD Panel lcd-panel 1 · part
6 Fastener Set fastener-set 12× 12 · part

Where the ECU interface is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 100 pcs 2–4 wks