BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Mechanical Sweep

Assembly

Towed wire and cutter array that severs the mooring cables of moored mines. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Mechanical Sweep parts and their functions

4 top-level parts · 9 parts in total · full bill of materials below
Mechanical Sweep parts diagram: 1 sweep wire, 2 wire cutter, 3 otter board, 4 depressor. 9 parts in 4 top-level items.
Mechanical Sweep parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Sweep Wire 1× Serrated tow wire that catches and parts mine mooring cables.
2 Wire Cutter 6× Explosive or mechanical cutter that severs a snagged mooring cable.
3 Otter Board 1× Paravane spreading the sweep wire out to one side of the towing track.
4 Depressor 1× Weighted body holding the sweep wire down to its working depth.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mechanical Sweep

4 top-level lines · 4 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sweep Wire minesweeper-ship-sweep-wire 1× 1 · part
2 Wire Cutter minesweeper-ship-cutter 6× 6 · part
3 Otter Board minesweeper-ship-otter 1× 1 · part
4 Depressor minesweeper-ship-depressor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the mechanical sweep is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks