Damage Control Systems
AssemblyFirefighting, dewatering, and CBRN protection systems keeping the ship fighting after damage. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Damage Control Systems parts and their functions
4 top-level parts · 17 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Firemain System 3 parts | 1× | Pressurized firemain and pumps |
| 2 | Dewatering Pump | 4× | Portable and fixed dewatering pumps |
| 3 | CBRN Protection | 1× | Citadel overpressure and washdown |
| 4 | Damage Control Console | 1× | Damage control monitoring console |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Damage Control Systems
4 top-level lines · 7 rows shown · 17 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Firemain System 3 parts | naval-destroyer-firemain | 1× | 1 | 11 | assembly |
| 1.1 | Fire Pump | naval-destroyer-fire-pump | 4× | 4 | · | part |
| 1.2 | Pressure Sensor | pressure-sensor | 6× | 6 | · | part |
| 1.3 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 2 | Dewatering Pump | naval-destroyer-dewatering-pump | 4× | 4 | · | part |
| 3 | CBRN Protection | naval-destroyer-cbrn-system | 1× | 1 | · | part |
| 4 | Damage Control Console | naval-destroyer-dc-console | 1× | 1 | · | part |
Where the damage control systems is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |