BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Main Canopy

Assembly

Large circular parachute of ripstop nylon with suspension lines, designed to deploy automatically and distribute load evenly. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Main Canopy parts and their functions

5 top-level parts · 92 parts in total · full bill of materials below
Main Canopy parts diagram: 1 ripstop nylon, 2 seam tape, 3 suspension line, 4 line attachment tape, 5 fastener set. 92 parts in 5 top-level items.
Main Canopy parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Ripstop Nylon 3× Ripstop canopy panels, 6.5 oz weight
2 Seam Tape 1× Stress tape along all seams for strength
3 Suspension Line 32× Braided nylon line, 1/16" diameter
4 Line Attachment Tape 32× Reinforcement patches at line attachment points
5 Fastener Set 24× Stitching thread and knots

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Main Canopy

5 top-level lines · 5 rows shown · 92 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Ripstop Nylon parachute-cargo-system-nylon-fabric 3× 3 · part
2 Seam Tape parachute-cargo-system-seam-tape 1× 1 · part
3 Suspension Line parachute-cargo-system-suspension-line 32× 32 · part
4 Line Attachment Tape parachute-cargo-system-line-attachment-tape 32× 32 · part
5 Fastener Set fastener-set 24× 24 · part

Something wrong in this list? Report a problem with this BOM.

Where the main canopy is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks