BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Descent System

Assembly

Parachute and release hardware that stabilize the buoy from drop altitudes up to 9,000 m and soften water entry. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Descent System parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Descent System parts diagram: 1 descent parachute, 2 parachute riser, 3 water-entry release, 4 rotochute vanes. 4 parts in 4 top-level items.
Descent System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Descent Parachute 1× Small ribbon canopy limiting descent to roughly 25-40 m/s and keeping the buoy nose-down for clean water entry.
2 Parachute Riser 1× Webbing link between canopy and buoy body, cut or released at splash.
3 Water-Entry Release 1× Impact- or water-sensing release that discards the parachute so it cannot foul the antenna or float.
4 Rotochute Vanes 1× Low-altitude variant

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Descent System

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Descent Parachute sonobuoy-parachute 1× 1 · part
2 Parachute Riser sonobuoy-riser 1× 1 · part
3 Water-Entry Release sonobuoy-release-mechanism 1× 1 · part
4 Rotochute Vanes sonobuoy-rotochute-vanes 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the descent system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳JLCPCB
jlcpcb.com ↗
Shenzhen, CN PCB fabrication 100 pcs 2–4 wks
🇨🇳PCBWay
pcbway.com ↗
Shenzhen, CN PCB fab & assembly 100 pcs 2–4 wks
scc.com.cn ↗ Shenzhen, CN PCB manufacturer 100 pcs 2–4 wks
shogini.com ↗ Mumbai, IN PCB manufacturer 100 pcs 2–4 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 100 pcs 2–4 wks