BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Strainer Basket

Assembly

Removable perforated cylinder, often mesh-lined, with an open area at least four times the pipe bore. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Strainer Basket parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Strainer Basket parts diagram: 1 basket shell, 2 mesh liner, 3 basket rim, 4 basket handle, 5 basket bottom. 5 parts in 5 top-level items.
Strainer Basket parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Basket Shell 1× Perforated 316 SS
2 Mesh Liner 1× Fine filtration option
3 Basket Rim 1× Sealing flange
4 Basket Handle 1× Fold-flat bail handle for lifting the loaded basket out vertically.
5 Basket Bottom 1× Reinforced end plate

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Strainer Basket

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Basket Shell basket-strainer-basket-shell 1× 1 · part
2 Mesh Liner basket-strainer-mesh-liner 1× 1 · part
3 Basket Rim basket-strainer-basket-rim 1× 1 · part
4 Basket Handle basket-strainer-basket-handle 1× 1 · part
5 Basket Bottom basket-strainer-basket-bottom 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the strainer basket is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks