Condition Monitoring
AssemblyInstrumentation that tracks bearing wear, rotor position, and winding temperature in the sealed motor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Condition Monitoring parts and their functions
6 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Bearing Wear Monitor | 1× | Rotor position gauge |
| 2 | Winding Thermostat | 2× | Winding over-temperature |
| 3 | Hall Sensor | 2× | Rotor position sensing |
| 4 | Bare PCB | 1× | Monitor electronics |
| 5 | SMD Passive (R/C/L) | 1× | Surface-mount resistors, capacitors, and inductors, typically in 0402 to 1206 packages, that set voltages, filter noise, and time signals on a circuit board. |
| 6 | Connector | 1× | Mating plug-and-socket pair that joins two lengths of wiring or a cable to a board so a circuit can be assembled, serviced, and separated without soldering. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Condition Monitoring
6 top-level lines · 6 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Bearing Wear Monitor | canned-motor-pump-bearing-monitor | 1× | 1 | · | part |
| 2 | Winding Thermostat | canned-motor-pump-thermostat | 2× | 2 | · | part |
| 3 | Hall Sensor | hall-sensor | 2× | 2 | · | part |
| 4 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 5 | SMD Passive (R/C/L) | smd-passives | 1× | 1 | · | part |
| 6 | Connector | connector | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the condition monitoring is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $3–$400. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BOE
boe.com ↗
|
Beijing, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳Tianma
tianma.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
|
🇨🇳TCL CSOT
szcsot.com ↗
|
Shenzhen, CN | Display panels | 1,000 pcs | 6–10 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |