BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Hammer Action

Assembly

Felt-covered wooden hammers mounted on an escapement action, striking plates from below. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Hammer Action parts and their functions

5 top-level parts · 149 parts in total · full bill of materials below
Hammer Action parts diagram: 1 hammer head, 2 hammer rod, 3 hammer spring, 4 escapement mechanism, 5 hammer guide rail. 149 parts in 5 top-level items.
Hammer Action parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hammer Head 49× Wooden hammer heads with glued felt coverings
2 Hammer Rod 49× Steel or hardwood rod connecting key to hammer
3 Hammer Spring 49× Return springs per hammer
4 Escapement Mechanism 1× Mechanical escapement preventing double-strike
5 Hammer Guide Rail 1× Guide rail supporting hammer alignment

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Hammer Action

5 top-level lines · 5 rows shown · 149 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hammer Head celesta-hammer-head 49× 49 · part
2 Hammer Rod celesta-hammer-rod 49× 49 · part
3 Hammer Spring celesta-hammer-spring 49× 49 · part
4 Escapement Mechanism celesta-escapement 1× 1 · part
5 Hammer Guide Rail celesta-hammer-rail 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the hammer action is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks