BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Immersion Tube

Assembly

Chemical-resistant outer tube, 1,000–1,200 mm long, carrying the rotating inner shaft down to the drum bottom. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Immersion Tube parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Immersion Tube parts diagram: 1 outer tube, 2 inner shaft, 3 shaft bushing, 4 foot strainer, 5 tube shaft seal. 7 parts in 5 top-level items.
Immersion Tube parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Outer Tube 1× PP, PVDF, or 316 SS
2 Inner Shaft 1× Stainless or Hastelloy shaft spinning at up to 10,000 rpm inside the outer tube.
3 Shaft Bushing 3× Intermediate guides
4 Foot Strainer 1× Slotted inlet cage at the tube foot that blocks debris larger than the impeller clearance.
5 Tube Shaft Seal 1× Optional shaft seal

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Immersion Tube

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Outer Tube drum-pump-outer-tube 1× 1 · part
2 Inner Shaft drum-pump-inner-shaft 1× 1 · part
3 Shaft Bushing drum-pump-shaft-bushing 3× 3 · part
4 Foot Strainer drum-pump-foot-strainer 1× 1 · part
5 Tube Shaft Seal drum-pump-tube-seal 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the immersion tube is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks