BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Roll Mechanism

Assembly

Feed and take-up spools advancing perforated paper roll at constant speed. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Roll Mechanism parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Roll Mechanism parts diagram: 1 feed spool, 2 takeup spool, 3 roll guide, 4 capstan roller, 5 synchronous drive, 6 drive belt. 6 parts in 6 top-level items.
Roll Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Feed Spool 1× Festooned holder for fresh roll
2 Takeup Spool 1× Driven takeup reel
3 Roll Guide 1× Tension and alignment rail
4 Capstan Roller 1× Pinch drive for roll advance
5 Synchronous Drive 1× Constant-speed transmission to capstan
6 Drive Belt 1× Power transmission

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Roll Mechanism

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Feed Spool player-piano-roll-spool-feed 1× 1 · part
2 Takeup Spool player-piano-roll-spool-take-up 1× 1 · part
3 Roll Guide player-piano-roll-guide 1× 1 · part
4 Capstan Roller player-piano-capstan-roller 1× 1 · part
5 Synchronous Drive player-piano-synchronous-drive 1× 1 · part
6 Drive Belt drive-belt 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the roll mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks