BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Station Building

Assembly

Substructure and superstructure that house and anchor the pumping plant. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Station Building parts and their functions

5 top-level parts · 55 parts in total · full bill of materials below
Station Building parts diagram: 1 foundation block, 2 superstructure, 3 access door, 4 ventilation fan, 5 cable trench. 55 parts in 5 top-level items.
Station Building parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Foundation Block 1× Pump and motor bases
2 Superstructure 1× Walls and roof
3 Access Door 2× Plant access
4 Ventilation Fan 4 parts 2× Motor room cooling
5 Cable Trench 1× Cable routing

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Station Building

5 top-level lines · 16 rows shown · 55 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Foundation Block irrigation-pump-station-foundation 1× 1 · part
2 Superstructure irrigation-pump-station-superstructure 1× 1 · part
3 Access Door irrigation-pump-station-access-doors 2× 2 · part
4 Ventilation Fan 4 parts irrigation-pump-station-ventilation-fan 2× 2 25 assembly
4.1 Stator Assembly 3 parts stator-assembly 1× 2 3 assembly
4.1.1 Stator Core (laminations) stator-core 1× 2 · part
4.1.2 Copper Winding copper-winding 1× 2 · part
4.1.3 Slot Insulation stator-insulation 1× 2 · part
4.2 Rotor Assembly 4 parts rotor-assembly 1× 2 19 assembly
4.2.1 Rotor Shaft rotor-shaft 1× 2 · part
4.2.2 Rotor Core rotor-core 1× 2 · part
4.2.3 Neodymium Magnet neodymium-magnet 16× 32 · part
4.2.4 Ball Bearing ball-bearing 1× 2 · part
4.3 Ball Bearing ball-bearing 2× 4 · part
4.4 Sheet Metal Panel sheet-panel 1× 2 · part
5 Cable Trench irrigation-pump-station-cable-trench 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the station building is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks