BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r5774 of this page, not the current version. Go to current · history

Settling Basin

Part

Lined excavation 50 m × 20 m allowing sand to drop before intake, protecting rotor from abrasion. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.