Ash Removal System
AssemblyAugers under the grate and heat exchanger that convey ash into a sealed bin, extending de-ashing intervals to several weeks. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Ash Removal System
5 top-level lines as of r14572| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Ash Auger | biomass-boiler-ash-auger | 2× | 2 | · | part |
| 2 | Ash Auger Gearmotor | biomass-boiler-ash-motor | 1× | 1 | · | part |
| 3 | Ash Bin | biomass-boiler-ash-bin | 1× | 1 | · | part |
| 4 | Grate Tipping Mechanism | biomass-boiler-grate-tipper | 1× | 1 | · | part |
| 5 | O-Ring Set | oring-set | 1× | 1 | · | part |