Wicket Gate Ring

Assembly

The ring of pivoting guide vanes that meter flow and set its swirl before it reaches the runner. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Wicket Gate Ring parts and their functions

5 top-level parts · 101 parts in total · full bill of materials below
Wicket Gate Ring parts diagram: 1 guide vane, 2 vane lever, 3 operating ring, 4 shear pin, 5 vane bushing. 101 parts in 5 top-level items.
Wicket Gate Ring parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Guide Vane 20× Guide vanes
2 Vane Lever 20× Vane levers
3 Operating Ring 1× Operating ring
4 Shear Pin 20× Shear pins
5 Vane Bushing 40× Vane bushings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Wicket Gate Ring

5 top-level lines · 5 rows shown · 101 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Guide Vane francis-turbine-guide-vane 20× 20 · part
2 Vane Lever francis-turbine-vane-arm 20× 20 · part
3 Operating Ring francis-turbine-shifting-ring 1× 1 · part
4 Shear Pin francis-turbine-shear-pin 20× 20 · part
5 Vane Bushing francis-turbine-vane-bushing 40× 40 · part

Something wrong in this list? Report a problem with this BOM.

Where the wicket gate ring is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks