Debris Handling System
AssemblyTrough, belt conveyor and chute that carry raked debris from the deck to a skip or truck. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Debris Handling System parts and their functions
7 top-level parts · 18 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Debris Trough | 1× | Receiving trough where the rake dumps debris |
| 2 | Conveyor Belt | 1× | Cleated belt carrying debris to the discharge end |
| 3 | Conveyor Roller | 12× | Idler rollers supporting the belt |
| 4 | Conveyor Motor | 1× | Geared drive motor for the conveyor |
| 5 | Discharge Chute | 1× | Chute directing debris into a skip or container |
| 6 | Belt Scraper | 1× | Belt scraper cleaning the return run |
| 7 | Drive Belt | 1× | Drive belt from the motor to the conveyor pulley |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Debris Handling System
7 top-level lines · 7 rows shown · 18 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Debris Trough | intake-trash-rack-debris-trough | 1× | 1 | · | part |
| 2 | Conveyor Belt | intake-trash-rack-conveyor-belt | 1× | 1 | · | part |
| 3 | Conveyor Roller | intake-trash-rack-conveyor-roller | 12× | 12 | · | part |
| 4 | Conveyor Motor | intake-trash-rack-conveyor-motor | 1× | 1 | · | part |
| 5 | Discharge Chute | intake-trash-rack-discharge-chute | 1× | 1 | · | part |
| 6 | Belt Scraper | intake-trash-rack-scraper | 1× | 1 | · | part |
| 7 | Drive Belt | drive-belt | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the debris handling system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |