Foundation
AssemblyReinforced concrete base pad and tripod or quadpod feet, rated for 60+ m/s wind uplift and lateral load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Foundation
5 top-level lines as of r105108| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Concrete Pad | met-mast-concrete-pad | 1× | 1 | · | part |
| 2 | Anchor Bolt | met-mast-anchor-bolt | 12× | 12 | · | part |
| 3 | Foundation Feet | met-mast-foundation-feet | 3× | 3 | · | part |
| 4 | Leveling Plate | met-mast-leveling-plate | 1× | 1 | · | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | · | part |