Foundation
AssemblyConcrete mat with embedded drains and oil-spill containment basin, isolating hot tank from ground water. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Foundation
4 top-level lines as of r110305| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Concrete Pad | molten-salt-concrete-pad | 1× | 1 | · | part |
| 2 | Drainage Layer | molten-salt-drainage-layer | 1× | 1 | · | part |
| 3 | Spill Berm | molten-salt-spill-berm | 1× | 1 | · | part |
| 4 | Anchor Lugs | molten-salt-anchor-lugs | 4× | 4 | · | part |