AssemblyOne of the four corner legs, a battered tubular column built from welded cans that runs the full height of the jacket and ends in a pile sleeve at the seabed. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Leg
5 top-level lines as of r116030| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Leg Can | owj-leg-can | 8× | 8 | · | part |
| 2 | Leg Weld | owj-leg-weld | 7× | 7 | · | part |
| 3 | Pile Sleeve | owj-pile-sleeve | 1× | 1 | · | part |
| 4 | Leg Stub | owj-leg-stub | 4× | 4 | · | part |
| 5 | Heavy Steel Plate | owm-steel-plate | 1× | 1 | · | part |