Monopile Tube
AssemblyThe primary structure: a long steel cylinder built from rolled cans welded end to end, with a thick driving section at the top and a tapered toe that is hammered deep into the seabed. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Monopile Tube
6 top-level lines as of r116059| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Rolled Can | owm-rolled-can | 30× | 30 | · | part |
| 2 | Circumferential Weld | owm-circ-weld | 29× | 29 | · | part |
| 3 | Longitudinal Weld | owm-long-weld | 30× | 30 | · | part |
| 4 | Pile Toe | owm-pile-toe | 1× | 1 | · | part |
| 5 | Driving Shoe | owm-driving-shoe | 1× | 1 | · | part |
| 6 | Heavy Steel Plate | owm-steel-plate | 1× | 1 | · | part |