Pile Toe
PartThe lower end of the pile, sometimes tapered, that first enters and cuts into the seabed during driving. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
The lower end of the pile, sometimes tapered, that first enters and cuts into the seabed during driving. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.