BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Support System

Assembly

Anchors and saddles that fix the conduit at bends and carry it across spans. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Support System parts and their functions

5 top-level parts · 118 parts in total · full bill of materials below
Support System parts diagram: 1 anchor block, 2 saddle support, 3 thrust collar, 4 slide bearing, 5 pier foundation. 118 parts in 5 assemblies.
Support System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Anchor Block 3 parts Concrete restraint at bends
2 Saddle Support 3 parts 18× Intermediate cradle support
3 Thrust Collar Transfers axial thrust to the anchor
4 Slide Bearing 18× Allows axial movement at saddles
5 Pier Foundation 18× Footing under each saddle

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Support System

5 top-level lines · 11 rows shown · 118 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Anchor Block 3 parts penstock-pipe-anchor-block 4 6 assembly
1.1 Concrete Mass penstock-pipe-concrete-mass 4 · part
1.2 Anchor Reinforcement Cage penstock-pipe-anchor-rebar 4 · part
1.3 Anchor Strap penstock-pipe-anchor-strap 16 · part
2 Saddle Support 3 parts penstock-pipe-saddle-support 18× 18 3 assembly
2.1 Saddle Plate penstock-pipe-saddle-plate 18 · part
2.2 Wear Pad penstock-pipe-wear-pad 18 · part
2.3 Fastener Set fastener-set 18 · part
3 Thrust Collar penstock-pipe-thrust-collar 4 · part
4 Slide Bearing penstock-pipe-slide-bearing 18× 18 · part
5 Pier Foundation penstock-pipe-pier-foundation 18× 18 · part

Where the support system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks