Structural Steel Frame
AssemblyWelded steel beam and column lattice supporting 40 tons of PV array and distributed wind load. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Structural Steel Frame parts and their functions
5 top-level parts · 46 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Structural Beam | 2× | W36 × 200 steel I-beams, 25 m span, moment-connected |
| 2 | Cross-Bracing Beam | 8× | W16 × 100 cross-beams every 3 m |
| 3 | Module Mounting Rafter | 24× | Welded angle iron trusses for PV module mounting |
| 4 | Support Column | 8× | W14 × 90 corner posts, bolted to foundation footings |
| 5 | Fastener Set | 4× | High-strength bolts, welds, and grounding lugs |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Structural Steel Frame
5 top-level lines · 5 rows shown · 46 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Structural Beam | solar-carport-system-primary-beam | 2× | 2 | · | part |
| 2 | Cross-Bracing Beam | solar-carport-system-secondary-beam | 8× | 8 | · | part |
| 3 | Module Mounting Rafter | solar-carport-system-rafter-truss | 24× | 24 | · | part |
| 4 | Support Column | solar-carport-system-column | 8× | 8 | · | part |
| 5 | Fastener Set | fastener-set | 4× | 4 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the structural steel frame is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |