Driven Pile
PartW-section steel pile driven 1.5–2.5 m into the ground at each bearing point. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
W-section steel pile driven 1.5–2.5 m into the ground at each bearing point. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.