BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r187806 of this page, not the current version. Go to current · history

Float Ballast

Part

Fixed concrete or water ballast that sets the float draft and tunes its natural heave period toward the dominant wave period. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.