BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Structure

Assembly

Welded steel gantry supporting all equipment at height for gravity flow. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Structure parts and their functions

5 top-level parts · 13 parts in total · full bill of materials below
Structure parts diagram: 1 main beam, 2 cross brace, 3 access platform, 4 sheet metal panel, 5 foundation pads. 13 parts in 5 top-level items.
Structure parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Beam 2× I-beam columns supporting main frame
2 Cross Brace 4× Diagonal bracing for rigidity
3 Access Platform 2× Steel walkway for operator access and maintenance
4 Sheet Metal Panel 4× Protective guards around rotating machinery
5 Foundation Pads 1× Concrete anchor pads for soil-mounted plants

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Structure

5 top-level lines · 5 rows shown · 13 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Beam aggregate-wash-plant-main-beam 2× 2 · part
2 Cross Brace aggregate-wash-plant-cross-brace 4× 4 · part
3 Access Platform aggregate-wash-plant-platform 2× 2 · part
4 Sheet Metal Panel sheet-panel 4× 4 · part
5 Foundation Pads aggregate-wash-plant-foundation 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the structure is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks