Continuous Miner

Product

Overview

A continuous miner cuts coal directly from the working face and loads it onto haulage in one uninterrupted operation, replacing the older cut-blast-load cycle. It is the primary production machine in room-and-pillar mining. The whole unit is built to flameproof standards because underground coal seams liberate methane, so every electrical box is an explosion-containing enclosure and gas is monitored continuously.

The machine is carried on a welded Main Body / Chassis that reacts cutting, tramming and stabilising loads. It propels itself on two independent Crawler Track Unit track units, each driven by a flameproof motor through a planetary final drive, which let it tram between cuts and steer within the entry.

How it works

Coal is won by the Cutter Head, a transverse drum studded with conical Carbide Cutting Pick tools in welded holders and spun by twin cutter motors through a sealed gearbox. The drum is mounted on the Cutter Boom, which hydraulic cylinders raise and lower so the operator can sump the drum into the seam and shear it from floor to roof across the full cutting height.

Cut coal falls to the floor and is swept inboard by the Gathering Head, whose rotating spinner arms drag it across a loading apron onto the Chain Flight Conveyor. This twin-strand chain-and-flight conveyor carries the coal the length of the machine to a discharge boom that slews and lifts to load shuttle cars or a continuous-haulage system on either side.

All booms, jacks and the gathering head draw flow from the central Hydraulic System. Because cutting generates respirable dust and frictional ignition risk, the Dust Suppression system floods the cutting zone with water sprays and pulls air through a flooded-bed scrubber. The Electrical System system feeds power through a trailing cable, monitors methane, and lets the machine be driven by radio remote from a safe standoff.

Continuous Miner parts and their functions

10 top-level parts · 425 parts in total · full bill of materials below
Continuous Miner parts diagram: 1 main body / chassis, 2 cutter head, 3 cutter boom, 4 gathering head, 5 chain flight conveyor, 6 crawler track unit, 7 hydraulic system, 8 dust suppression, 9 electrical system, 10 stabilizer jack. 425 parts in 10 top-level items.
Continuous Miner parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Body / Chassis 3 parts 1× Welded chassis + explosion-proof enclosures
2 Cutter Head 5 parts 1× Rotating cutter drum assembly
3 Cutter Boom 3 parts 1× Boom + lift cylinders
4 Gathering Head 3 parts 1× Gathering arms + apron
5 Chain Flight Conveyor 6 parts 1× Onboard chain flight conveyor
6 Crawler Track Unit 5 parts 2× Left + right track units
7 Hydraulic System 4 parts 1× Pump, valves, tank
8 Dust Suppression 3 parts 1× Water spray + scrubber
9 Electrical System 8 parts 1× Power + control + sensing
10 Stabilizer Jack 2 parts 2× Rear stabilizer jacks

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Continuous Miner

10 top-level lines · 97 rows shown · 425 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Body / Chassis 3 parts continuous-miner-main-body 1× 1 7 assembly
1.1 Main Frame Weldment continuous-miner-main-frame 1× 1 · part
1.2 Flameproof Enclosure continuous-miner-fp-enclosure 2× 2 · part
1.3 Fastener Set fastener-set 4× 4 · part
2 Cutter Head 5 parts continuous-miner-cutter-head 1× 1 148 assembly
2.1 Cutter Drum continuous-miner-cutter-drum 1× 1 · part
2.2 Carbide Cutting Pick continuous-miner-cutting-pick 80× 80 · part
2.3 Cutter Drive Motor 6 parts continuous-miner-cutter-motor 2× 2 27 assembly
2.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 2 3 assembly
2.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 2 19 assembly
2.3.3 Copper Winding copper-winding 1× 2 · part
2.3.4 Motor Housing motor-housing 1× 2 · part
2.3.5 Ball Bearing ball-bearing 2× 4 · part
2.3.6 Oil Seal oil-seal 1× 2 · part
2.4 Cutter Gearbox 4 parts continuous-miner-cutter-gearbox 1× 1 9 assembly
2.4.1 Gearbox Housing gearbox-housing 1× 1 · part
2.4.2 Helical Gear Pair gear-pair 2× 2 · part
2.4.3 Ball Bearing ball-bearing 4× 4 · part
2.4.4 Oil Seal oil-seal 2× 2 · part
2.5 Ball Bearing ball-bearing 4× 4 · part
3 Cutter Boom 3 parts continuous-miner-cutter-boom 1× 1 6 assembly
3.1 Boom Weldment continuous-miner-boom-weldment 1× 1 · part
3.2 Hydraulic Cylinder 2 parts continuous-miner-cylinder 2× 2 2 assembly
3.2.1 Piston Rod & Barrel continuous-miner-piston-rod 1× 2 · part
3.2.2 O-Ring Set oring-set 1× 2 · part
3.3 Fastener Set fastener-set 1× 1 · part
4 Gathering Head 3 parts continuous-miner-gathering-head 1× 1 55 assembly
4.1 Gathering Apron continuous-miner-apron 1× 1 · part
4.2 Gathering Arm / Spinner continuous-miner-gathering-arm 2× 2 · part
4.3 Flameproof Drive Motor 5 parts continuous-miner-drive-motor 2× 2 26 assembly
4.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 2 3 assembly
4.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 2 19 assembly
4.3.3 Motor Housing motor-housing 1× 2 · part
4.3.4 Ball Bearing ball-bearing 2× 4 · part
4.3.5 Oil Seal oil-seal 1× 2 · part
5 Chain Flight Conveyor 6 parts continuous-miner-conveyor 1× 1 74 assembly
5.1 Conveyor Chain continuous-miner-conveyor-chain 1× 1 · part
5.2 Conveyor Flight Bar continuous-miner-conveyor-flight 40× 40 · part
5.3 Conveyor Sprocket continuous-miner-conveyor-sprocket 2× 2 · part
5.4 Flameproof Drive Motor 5 parts continuous-miner-drive-motor 1× 1 26 assembly
5.4.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
5.4.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
5.4.3 Motor Housing motor-housing 1× 1 · part
5.4.4 Ball Bearing ball-bearing 2× 2 · part
5.4.5 Oil Seal oil-seal 1× 1 · part
5.5 Conveyor Tailpiece continuous-miner-tailpiece 1× 1 · part
5.6 Discharge Boom 1 parts continuous-miner-discharge-boom 1× 1 4 assembly
5.6.1 Hydraulic Cylinder 2 parts + deeper › continuous-miner-cylinder 2× 2 2 assembly
6 Crawler Track Unit 5 parts continuous-miner-crawler 2× 2 36 assembly
6.1 Track Frame continuous-miner-track-frame 1× 2 · part
6.2 Track Chain & Shoes continuous-miner-track-chain 1× 2 · part
6.3 Track Drive Sprocket continuous-miner-drive-sprocket 1× 2 · part
6.4 Flameproof Drive Motor 5 parts continuous-miner-drive-motor 1× 2 26 assembly
6.4.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 2 3 assembly
6.4.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 2 19 assembly
6.4.3 Motor Housing motor-housing 1× 2 · part
6.4.4 Ball Bearing ball-bearing 2× 4 · part
6.4.5 Oil Seal oil-seal 1× 2 · part
6.5 Planetary Reducer 4 parts continuous-miner-planetary-reducer 1× 2 7 assembly
6.5.1 Gearbox Housing gearbox-housing 1× 2 · part
6.5.2 Helical Gear Pair gear-pair 2× 4 · part
6.5.3 Ball Bearing ball-bearing 3× 6 · part
6.5.4 Oil Seal oil-seal 1× 2 · part
7 Hydraulic System 4 parts continuous-miner-hydraulic-system 1× 1 4 assembly
7.1 Hydraulic Pump continuous-miner-hydraulic-pump 1× 1 · part
7.2 Valve Bank continuous-miner-valve-bank 1× 1 · part
7.3 Hydraulic Reservoir continuous-miner-hydraulic-tank 1× 1 · part
7.4 O-Ring Set oring-set 1× 1 · part
8 Dust Suppression 3 parts continuous-miner-dust-suppression 1× 1 28 assembly
8.1 Water Spray Manifold continuous-miner-spray-manifold 1× 1 · part
8.2 Flooded-Bed Scrubber continuous-miner-scrubber 1× 1 · part
8.3 Flameproof Drive Motor 5 parts continuous-miner-drive-motor 1× 1 26 assembly
8.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
8.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
8.3.3 Motor Housing motor-housing 1× 1 · part
8.3.4 Ball Bearing ball-bearing 2× 2 · part
8.3.5 Oil Seal oil-seal 1× 1 · part
9 Electrical System 8 parts continuous-miner-electrical 1× 1 25 assembly
9.1 Trailing Cable continuous-miner-trailing-cable 1× 1 · part
9.2 Onboard Transformer continuous-miner-transformer 1× 1 · part
9.3 Control Board 3 parts continuous-miner-control-board 1× 1 6 assembly
9.3.1 Bare PCB pcb-bare 1× 1 · part
9.3.2 Microcontroller mcu 1× 1 · part
9.3.3 Connector connector 4× 4 · part
9.4 Methane Sensor continuous-miner-methane-sensor 1× 1 · part
9.5 Remote Radio Control 3 parts continuous-miner-remote-control 1× 1 3 assembly
9.5.1 Bare PCB pcb-bare 1× 1 · part
9.5.2 Microcontroller mcu 1× 1 · part
9.5.3 LCD Panel lcd-panel 1× 1 · part
9.6 Flameproof Lamp continuous-miner-light 4× 4 · part
9.7 Wire Bundle wire-bundle 1× 1 · part
9.8 Connector connector 8× 8 · part
10 Stabilizer Jack 2 parts continuous-miner-stabilizer-jack 2× 2 3 assembly
10.1 Hydraulic Cylinder 2 parts continuous-miner-cylinder 1× 2 2 assembly
10.1.1 Piston Rod & Barrel continuous-miner-piston-rod 1× 2 · part
10.1.2 O-Ring Set oring-set 1× 2 · part
10.2 Jack Foot Pad continuous-miner-jack-foot 1× 2 · part

Something wrong in this list? Report a problem with this BOM.

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $200k–$5M. How estimates work
VendorHQSpecialtyMOQLead time
🇺🇸Caterpillar
caterpillar.com ↗
Irving, US Construction & mining equipment made to order 20–36 wks
🇯🇵Komatsu
komatsu.com ↗
Tokyo, JP Construction & mining equipment made to order 20–36 wks
🇸🇪Sandvik
rocktechnology.sandvik ↗
Stockholm, SE Mining & rock technology made to order 20–36 wks
🇸🇪Epiroc
epiroc.com ↗
Stockholm, SE Mining & drilling equipment made to order 20–36 wks
🇫🇮Metso
metso.com ↗
Helsinki, FI Crushing & minerals processing made to order 20–36 wks

329-word article