Continuous Miner
ProductOverview
A continuous miner cuts coal directly from the working face and loads it onto haulage in one uninterrupted operation, replacing the older cut-blast-load cycle. It is the primary production machine in room-and-pillar mining. The whole unit is built to flameproof standards because underground coal seams liberate methane, so every electrical box is an explosion-containing enclosure and gas is monitored continuously.
The machine is carried on a welded Main Body / Chassis that reacts cutting, tramming and stabilising loads. It propels itself on two independent Crawler Track Unit track units, each driven by a flameproof motor through a planetary final drive, which let it tram between cuts and steer within the entry.
How it works
Coal is won by the Cutter Head, a transverse drum studded with conical Carbide Cutting Pick tools in welded holders and spun by twin cutter motors through a sealed gearbox. The drum is mounted on the Cutter Boom, which hydraulic cylinders raise and lower so the operator can sump the drum into the seam and shear it from floor to roof across the full cutting height.
Cut coal falls to the floor and is swept inboard by the Gathering Head, whose rotating spinner arms drag it across a loading apron onto the Chain Flight Conveyor. This twin-strand chain-and-flight conveyor carries the coal the length of the machine to a discharge boom that slews and lifts to load shuttle cars or a continuous-haulage system on either side.
All booms, jacks and the gathering head draw flow from the central Hydraulic System. Because cutting generates respirable dust and frictional ignition risk, the Dust Suppression system floods the cutting zone with water sprays and pulls air through a flooded-bed scrubber. The Electrical System system feeds power through a trailing cable, monitors methane, and lets the machine be driven by radio remote from a safe standoff.
Continuous Miner parts and their functions
10 top-level parts · 425 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Body / Chassis 3 parts | 1× | Welded chassis + explosion-proof enclosures |
| 2 | Cutter Head 5 parts | 1× | Rotating cutter drum assembly |
| 3 | Cutter Boom 3 parts | 1× | Boom + lift cylinders |
| 4 | Gathering Head 3 parts | 1× | Gathering arms + apron |
| 5 | Chain Flight Conveyor 6 parts | 1× | Onboard chain flight conveyor |
| 6 | Crawler Track Unit 5 parts | 2× | Left + right track units |
| 7 | Hydraulic System 4 parts | 1× | Pump, valves, tank |
| 8 | Dust Suppression 3 parts | 1× | Water spray + scrubber |
| 9 | Electrical System 8 parts | 1× | Power + control + sensing |
| 10 | Stabilizer Jack 2 parts | 2× | Rear stabilizer jacks |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labourTap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Continuous Miner
10 top-level lines · 97 rows shown · 425 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Body / Chassis 3 parts | continuous-miner-main-body | 1× | 1 | 7 | assembly |
| 1.1 | Main Frame Weldment | continuous-miner-main-frame | 1× | 1 | · | part |
| 1.2 | Flameproof Enclosure | continuous-miner-fp-enclosure | 2× | 2 | · | part |
| 1.3 | Fastener Set | fastener-set | 4× | 4 | · | part |
| 2 | Cutter Head 5 parts | continuous-miner-cutter-head | 1× | 1 | 148 | assembly |
| 2.1 | Cutter Drum | continuous-miner-cutter-drum | 1× | 1 | · | part |
| 2.2 | Carbide Cutting Pick | continuous-miner-cutting-pick | 80× | 80 | · | part |
| 2.3 | Cutter Drive Motor 6 parts | continuous-miner-cutter-motor | 2× | 2 | 27 | assembly |
| 2.3.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 2 | 3 | assembly |
| 2.3.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 2 | 19 | assembly |
| 2.3.3 | Copper Winding | copper-winding | 1× | 2 | · | part |
| 2.3.4 | Motor Housing | motor-housing | 1× | 2 | · | part |
| 2.3.5 | Ball Bearing | ball-bearing | 2× | 4 | · | part |
| 2.3.6 | Oil Seal | oil-seal | 1× | 2 | · | part |
| 2.4 | Cutter Gearbox 4 parts | continuous-miner-cutter-gearbox | 1× | 1 | 9 | assembly |
| 2.4.1 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 2.4.2 | Helical Gear Pair | gear-pair | 2× | 2 | · | part |
| 2.4.3 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 2.4.4 | Oil Seal | oil-seal | 2× | 2 | · | part |
| 2.5 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 3 | Cutter Boom 3 parts | continuous-miner-cutter-boom | 1× | 1 | 6 | assembly |
| 3.1 | Boom Weldment | continuous-miner-boom-weldment | 1× | 1 | · | part |
| 3.2 | Hydraulic Cylinder 2 parts | continuous-miner-cylinder | 2× | 2 | 2 | assembly |
| 3.2.1 | Piston Rod & Barrel | continuous-miner-piston-rod | 1× | 2 | · | part |
| 3.2.2 | O-Ring Set | oring-set | 1× | 2 | · | part |
| 3.3 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 4 | Gathering Head 3 parts | continuous-miner-gathering-head | 1× | 1 | 55 | assembly |
| 4.1 | Gathering Apron | continuous-miner-apron | 1× | 1 | · | part |
| 4.2 | Gathering Arm / Spinner | continuous-miner-gathering-arm | 2× | 2 | · | part |
| 4.3 | Flameproof Drive Motor 5 parts | continuous-miner-drive-motor | 2× | 2 | 26 | assembly |
| 4.3.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 2 | 3 | assembly |
| 4.3.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 2 | 19 | assembly |
| 4.3.3 | Motor Housing | motor-housing | 1× | 2 | · | part |
| 4.3.4 | Ball Bearing | ball-bearing | 2× | 4 | · | part |
| 4.3.5 | Oil Seal | oil-seal | 1× | 2 | · | part |
| 5 | Chain Flight Conveyor 6 parts | continuous-miner-conveyor | 1× | 1 | 74 | assembly |
| 5.1 | Conveyor Chain | continuous-miner-conveyor-chain | 1× | 1 | · | part |
| 5.2 | Conveyor Flight Bar | continuous-miner-conveyor-flight | 40× | 40 | · | part |
| 5.3 | Conveyor Sprocket | continuous-miner-conveyor-sprocket | 2× | 2 | · | part |
| 5.4 | Flameproof Drive Motor 5 parts | continuous-miner-drive-motor | 1× | 1 | 26 | assembly |
| 5.4.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 5.4.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 5.4.3 | Motor Housing | motor-housing | 1× | 1 | · | part |
| 5.4.4 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 5.4.5 | Oil Seal | oil-seal | 1× | 1 | · | part |
| 5.5 | Conveyor Tailpiece | continuous-miner-tailpiece | 1× | 1 | · | part |
| 5.6 | Discharge Boom 1 parts | continuous-miner-discharge-boom | 1× | 1 | 4 | assembly |
| 5.6.1 | Hydraulic Cylinder 2 parts + deeper › | continuous-miner-cylinder | 2× | 2 | 2 | assembly |
| 6 | Crawler Track Unit 5 parts | continuous-miner-crawler | 2× | 2 | 36 | assembly |
| 6.1 | Track Frame | continuous-miner-track-frame | 1× | 2 | · | part |
| 6.2 | Track Chain & Shoes | continuous-miner-track-chain | 1× | 2 | · | part |
| 6.3 | Track Drive Sprocket | continuous-miner-drive-sprocket | 1× | 2 | · | part |
| 6.4 | Flameproof Drive Motor 5 parts | continuous-miner-drive-motor | 1× | 2 | 26 | assembly |
| 6.4.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 2 | 3 | assembly |
| 6.4.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 2 | 19 | assembly |
| 6.4.3 | Motor Housing | motor-housing | 1× | 2 | · | part |
| 6.4.4 | Ball Bearing | ball-bearing | 2× | 4 | · | part |
| 6.4.5 | Oil Seal | oil-seal | 1× | 2 | · | part |
| 6.5 | Planetary Reducer 4 parts | continuous-miner-planetary-reducer | 1× | 2 | 7 | assembly |
| 6.5.1 | Gearbox Housing | gearbox-housing | 1× | 2 | · | part |
| 6.5.2 | Helical Gear Pair | gear-pair | 2× | 4 | · | part |
| 6.5.3 | Ball Bearing | ball-bearing | 3× | 6 | · | part |
| 6.5.4 | Oil Seal | oil-seal | 1× | 2 | · | part |
| 7 | Hydraulic System 4 parts | continuous-miner-hydraulic-system | 1× | 1 | 4 | assembly |
| 7.1 | Hydraulic Pump | continuous-miner-hydraulic-pump | 1× | 1 | · | part |
| 7.2 | Valve Bank | continuous-miner-valve-bank | 1× | 1 | · | part |
| 7.3 | Hydraulic Reservoir | continuous-miner-hydraulic-tank | 1× | 1 | · | part |
| 7.4 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 8 | Dust Suppression 3 parts | continuous-miner-dust-suppression | 1× | 1 | 28 | assembly |
| 8.1 | Water Spray Manifold | continuous-miner-spray-manifold | 1× | 1 | · | part |
| 8.2 | Flooded-Bed Scrubber | continuous-miner-scrubber | 1× | 1 | · | part |
| 8.3 | Flameproof Drive Motor 5 parts | continuous-miner-drive-motor | 1× | 1 | 26 | assembly |
| 8.3.1 | Stator Assembly 3 parts + deeper › | stator-assembly | 1× | 1 | 3 | assembly |
| 8.3.2 | Rotor Assembly 4 parts + deeper › | rotor-assembly | 1× | 1 | 19 | assembly |
| 8.3.3 | Motor Housing | motor-housing | 1× | 1 | · | part |
| 8.3.4 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 8.3.5 | Oil Seal | oil-seal | 1× | 1 | · | part |
| 9 | Electrical System 8 parts | continuous-miner-electrical | 1× | 1 | 25 | assembly |
| 9.1 | Trailing Cable | continuous-miner-trailing-cable | 1× | 1 | · | part |
| 9.2 | Onboard Transformer | continuous-miner-transformer | 1× | 1 | · | part |
| 9.3 | Control Board 3 parts | continuous-miner-control-board | 1× | 1 | 6 | assembly |
| 9.3.1 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 9.3.2 | Microcontroller | mcu | 1× | 1 | · | part |
| 9.3.3 | Connector | connector | 4× | 4 | · | part |
| 9.4 | Methane Sensor | continuous-miner-methane-sensor | 1× | 1 | · | part |
| 9.5 | Remote Radio Control 3 parts | continuous-miner-remote-control | 1× | 1 | 3 | assembly |
| 9.5.1 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 9.5.2 | Microcontroller | mcu | 1× | 1 | · | part |
| 9.5.3 | LCD Panel | lcd-panel | 1× | 1 | · | part |
| 9.6 | Flameproof Lamp | continuous-miner-light | 4× | 4 | · | part |
| 9.7 | Wire Bundle | wire-bundle | 1× | 1 | · | part |
| 9.8 | Connector | connector | 8× | 8 | · | part |
| 10 | Stabilizer Jack 2 parts | continuous-miner-stabilizer-jack | 2× | 2 | 3 | assembly |
| 10.1 | Hydraulic Cylinder 2 parts | continuous-miner-cylinder | 1× | 2 | 2 | assembly |
| 10.1.1 | Piston Rod & Barrel | continuous-miner-piston-rod | 1× | 2 | · | part |
| 10.1.2 | O-Ring Set | oring-set | 1× | 2 | · | part |
| 10.2 | Jack Foot Pad | continuous-miner-jack-foot | 1× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $200k–$5M. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| caterpillar.com ↗ | Irving, US | Construction & mining equipment | made to order | 20–36 wks |
|
🇯🇵Komatsu
komatsu.com ↗
|
Tokyo, JP | Construction & mining equipment | made to order | 20–36 wks |
|
🇸🇪Sandvik
rocktechnology.sandvik ↗
|
Stockholm, SE | Mining & rock technology | made to order | 20–36 wks |
|
🇸🇪Epiroc
epiroc.com ↗
|
Stockholm, SE | Mining & drilling equipment | made to order | 20–36 wks |
|
🇫🇮Metso
metso.com ↗
|
Helsinki, FI | Crushing & minerals processing | made to order | 20–36 wks |
329-word article