Large Hydraulic Mining Excavator

Product

Overview

A large hydraulic mining excavator is a self-contained digging machine that loads haul trucks in open pits, competing with the electric rope shovel for the same job. Instead of wire ropes and a rack-and-pinion crowd, it uses hydraulic cylinders to move a boom, stick, and bucket, and it carries its own diesel power rather than drawing from a trailing cable. That makes it mobile: it can drive across a pit, work several faces in a shift, and reposition quickly, which is its main advantage over a rope shovel. The largest examples weigh close to a thousand tonnes and fill an ultra-class haul truck in three to five passes.

The machine has a tracked Undercarriage, a Slew Ring that lets the Upperstructure rotate, a Power Module driving a Hydraulic System, and a Front Shovel Attachment that digs. A Operator Cab and a Cooling Package package complete it.

How it digs

In a front-shovel configuration the machine digs away from itself and upward into a bank. The Boom Cylinder rams raise the Boom, the Stick Cylinder crowds the Stick forward, and the Bucket Cylinder rolls the Bucket to fill it. The operator blends these three motions to drag the bucket up the face. Once full, the Swing Drive units rotate the upper to the truck, and the Clam Door on the bucket bottom trips open to drop the load. The cycle repeats every half minute. A backhoe configuration reverses the geometry to dig below grade, which suits selective digging and trench-like benches.

The hydraulic system

Hydraulics are what set this machine apart. The Power Module turns several Main Pump variable-displacement pumps that supply oil at three hundred bar and more. The Main Control Valve spool banks route that oil to the cylinders, swing, and travel as the operator commands, and only deliver the flow each motion needs so the engines are not wasted driving idle functions. Accumulator accumulators smooth pressure spikes and store energy, a Hydraulic Tank reservoir holds and de-aerates the oil, and Hydraulic Filter filters keep it clean, because the close-tolerance pumps fail quickly on dirty oil. A High-Pressure Hose Set of reinforced hoses carries the flow out to the constantly moving front, sealed by an O-Ring Set at every joint. Hydraulics give fine, independent control of each motion, which is why the same machine can dig both aggressively and precisely.

Power module

Most ultra-class excavators are diesel-powered for mobility. The Power Module runs one or two Diesel Engine engines, each a large unit with a cast Engine Block, a forged Crankshaft, multiple Piston pistons, Turbocharger turbochargers, and common-rail Fuel Injector injectors. A Pump Drive Gearbox gearbox splits engine power among the pumps. Some mines order electric-drive versions that replace the engines with a motor fed from a trailing cable, trading mobility for lower fuel cost and cleaner operation, though this gives up the freedom that makes the hydraulic excavator attractive in the first place.

Front attachment and bucket

The Front Shovel Attachment is the working linkage. The Boom and Stick are heavy weldments joined by hardened Pin and Bushing Set pins and bushings that take the dig reactions. The Bucket is a wear-plate Bucket Body fitted with Bucket Tooth teeth on Tooth Adapter adapters, Bucket Liner liners inside, and a Clam Door for bottom dumping. As on a rope shovel, the teeth are the fastest-wearing parts and are changed without welding.

Undercarriage and travel

The Undercarriage gives the machine its mobility. Two Track Frame frames carry Track Chain chains over Track Roller rollers, driven by Drive Sprocket sprockets turned by Travel Drive hydraulic final drives. The Slew Ring slew ring carries the upper load through its Slew Race races and lets the Swing Motor motors rotate the machine around the Slew Ring Gear. Unlike a rope shovel tied to a cable, this machine can tram across the pit under its own power.

Cooling, cab, and trade-offs

Rejecting heat is a major task at this scale. The Cooling Package package runs Radiator radiators, Oil Cooler oil coolers, and Charge-Air Cooler charge-air coolers behind large Cooling Fan fans. The operator works from the Operator Cab, with two Joystick joysticks, LCD Panel displays, and a Machine Controller that manages pump output and engine load. Compared with a rope shovel, the hydraulic excavator is more mobile and more flexible, digs both up and down, and costs less to buy, while the rope shovel usually moves more material per hour in hard ore and costs less to run on grid power. Mines often run both, matching each to the part of the pit where its strengths pay off.

Large Hydraulic Mining Excavator parts and their functions

8 top-level parts · 494 parts in total · full bill of materials below
Large Hydraulic Mining Excavator parts diagram: 1 undercarriage, 2 slew ring, 3 upperstructure, 4 power module, 5 hydraulic system, 6 front shovel attachment, 7 operator cab, 8 cooling package. 494 parts in 8 assemblies.
Large Hydraulic Mining Excavator parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Undercarriage 6 parts Tracked undercarriage
2 Slew Ring 3 parts Slew ring
3 Upperstructure 4 parts Upperstructure
4 Power Module 4 parts Engine or electric power module
5 Hydraulic System 7 parts Main hydraulic system
6 Front Shovel Attachment 7 parts Front shovel attachment
7 Operator Cab 5 parts Operator cab
8 Cooling Package 4 parts Cooling package

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Large Hydraulic Mining Excavator

8 top-level lines · 70 rows shown · 494 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Undercarriage 6 parts hydraulic-mining-excavator-undercarriage 1 34 assembly
1.1 Track Frame hydraulic-mining-excavator-track-frame 2 · part
1.2 Track Chain hydraulic-mining-excavator-track-chain 2 · part
1.3 Track Roller hydraulic-mining-excavator-track-roller 16× 16 · part
1.4 Drive Sprocket hydraulic-mining-excavator-sprocket 2 · part
1.5 Travel Drive 4 parts hydraulic-mining-excavator-travel-drive 2 5 assembly
1.5.1 Travel Motor hydraulic-mining-excavator-travel-motor 2 · part
1.5.2 Helical Gear Pair gear-pair 2 · part
1.5.3 Gearbox Housing gearbox-housing 2 · part
1.5.4 Ball Bearing ball-bearing 4 · part
1.6 Idler hydraulic-mining-excavator-idler 2 · part
2 Slew Ring 3 parts hydraulic-mining-excavator-swing-bearing 1 8 assembly
2.1 Slew Race hydraulic-mining-excavator-slew-race 1 · part
2.2 Slew Ring Gear hydraulic-mining-excavator-slew-gear 1 · part
2.3 Swing Drive 3 parts hydraulic-mining-excavator-swing-drive 2 3 assembly
2.3.1 Swing Motor hydraulic-mining-excavator-swing-motor 2 · part
2.3.2 Helical Gear Pair gear-pair 2 · part
2.3.3 Gearbox Housing gearbox-housing 2 · part
3 Upperstructure 4 parts hydraulic-mining-excavator-upper-frame 1 4 assembly
3.1 Main Frame hydraulic-mining-excavator-main-frame 1 · part
3.2 Counterweight hydraulic-mining-excavator-counterweight 1 · part
3.3 Walkway hydraulic-mining-excavator-walkway 1 · part
3.4 Fuel Tank hydraulic-mining-excavator-fuel-tank 1 · part
4 Power Module 4 parts hydraulic-mining-excavator-power-module 1 77 assembly
4.1 Diesel Engine 5 parts hydraulic-mining-excavator-diesel-engine 2 36 assembly
4.1.1 Engine Block hydraulic-mining-excavator-engine-block 2 · part
4.1.2 Crankshaft hydraulic-mining-excavator-crankshaft 2 · part
4.1.3 Piston hydraulic-mining-excavator-piston 16× 32 · part
4.1.4 Turbocharger hydraulic-mining-excavator-turbocharger 4 · part
4.1.5 Fuel Injector hydraulic-mining-excavator-fuel-injector 16× 32 · part
4.2 Pump Drive Gearbox hydraulic-mining-excavator-pump-distribution 1 · part
4.3 Air Cleaner hydraulic-mining-excavator-air-cleaner 2 · part
4.4 Exhaust System hydraulic-mining-excavator-exhaust 2 · part
5 Hydraulic System 7 parts hydraulic-mining-excavator-hydraulic-system 1 22 assembly
5.1 Main Pump hydraulic-mining-excavator-main-pump 4 · part
5.2 Main Control Valve hydraulic-mining-excavator-control-valve 2 · part
5.3 Accumulator hydraulic-mining-excavator-accumulator 4 · part
5.4 Hydraulic Tank hydraulic-mining-excavator-hyd-tank 1 · part
5.5 Hydraulic Filter hydraulic-mining-excavator-hyd-filter 6 · part
5.6 High-Pressure Hose Set hydraulic-mining-excavator-hose-set 1 · part
5.7 O-Ring Set oring-set 4 · part
6 Front Shovel Attachment 7 parts hydraulic-mining-excavator-front-shovel 1 31 assembly
6.1 Boom hydraulic-mining-excavator-boom 1 · part
6.2 Stick hydraulic-mining-excavator-stick 1 · part
6.3 Bucket 5 parts hydraulic-mining-excavator-bucket 1 22 assembly
6.3.1 Bucket Body hydraulic-mining-excavator-bucket-body 1 · part
6.3.2 Bucket Tooth hydraulic-mining-excavator-bucket-tooth 6 · part
6.3.3 Tooth Adapter hydraulic-mining-excavator-bucket-adapter 6 · part
6.3.4 Bucket Liner hydraulic-mining-excavator-bucket-liner 8 · part
6.3.5 Clam Door hydraulic-mining-excavator-clam-door 1 · part
6.4 Boom Cylinder hydraulic-mining-excavator-boom-cylinder 2 · part
6.5 Stick Cylinder hydraulic-mining-excavator-stick-cylinder 2 · part
6.6 Bucket Cylinder hydraulic-mining-excavator-bucket-cylinder 2 · part
6.7 Pin and Bushing Set hydraulic-mining-excavator-pin-set 1 · part
7 Operator Cab 5 parts hydraulic-mining-excavator-cab 1 310 assembly
7.1 Cab Shell hydraulic-mining-excavator-cab-shell 1 · part
7.2 Operator Seat hydraulic-mining-excavator-seat 1 · part
7.3 Joystick hydraulic-mining-excavator-joystick 2 · part
7.4 LCD Panel lcd-panel 2 · part
7.5 Machine Controller 5 parts hydraulic-mining-excavator-controller 1 304 assembly
7.5.1 Bare PCB pcb-bare 3 · part
7.5.2 Microcontroller mcu 3 · part
7.5.3 SMD Passive (R/C/L) smd-passives 250× 250 · part
7.5.4 Connector connector 40× 40 · part
7.5.5 Pressure Sensor pressure-sensor 8 · part
8 Cooling Package 4 parts hydraulic-mining-excavator-cooling 1 8 assembly
8.1 Radiator hydraulic-mining-excavator-radiator 2 · part
8.2 Oil Cooler hydraulic-mining-excavator-oil-cooler 2 · part
8.3 Charge-Air Cooler hydraulic-mining-excavator-charge-cooler 2 · part
8.4 Cooling Fan hydraulic-mining-excavator-cooling-fan 2 · part

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $200k–$5M. How estimates work
VendorHQSpecialtyMOQLead time
🇺🇸Caterpillar
caterpillar.com ↗
Irving, US Construction & mining equipment made to order 20–36 wks
🇯🇵Komatsu
komatsu.com ↗
Tokyo, JP Construction & mining equipment made to order 20–36 wks
🇸🇪Sandvik
rocktechnology.sandvik ↗
Stockholm, SE Mining & rock technology made to order 20–36 wks
🇸🇪Epiroc
epiroc.com ↗
Stockholm, SE Mining & drilling equipment made to order 20–36 wks
🇫🇮Metso
metso.com ↗
Helsinki, FI Crushing & minerals processing made to order 20–36 wks

946-word article